Tous les projets

Scores recalculés il y a 4 jours

TA’ZIZ blue ammonia

Construction✓ Source confirmée

TA'ZIZ (ADNOC + ADQ) + Fertiglobe + Mitsui & Co. + GS Energy; EPC: Tecnimont (MAIRE)

Aperçu du projet

Pays
United Arab Emirates
Région
Abu Dhabi
Capacité
Non publiée
Technologie
SMR + CCS
Investissement
—
Statut de la subvention
—

Non modélisé ici

This project is not electrolytic hydrogen, so the LCOH engine cannot model it: there is no electrolyser capex, no kWh/kg of electricity and no stack to replace. GaugeH2 refuses the conversion rather than returning a number of the wrong shape. Catalogue technology: smr_ccs.

Not determinableChapitre 8 · R46

RFNBO threshold by feedstock

This is a fossil route and the record does not state a capture rate. To fall below the RFNBO limit of 3.384 kg CO2e/kg H2 it would need at least 70.2 % capture. GaugeH2 does not know whether this project reaches it, and does not assume it.

Calendrier de développement

Annoncé2021
FID2024
Construction2024
En service2027date prévue

Score de maturité

45/ 100
En développement

Liste pondérée d’informations publiques. Ce n’est pas une prédiction de succès.

Développement

✓Décision finale d’investissement(implicite)+15
✓Contrat EPC signé(implicite)+10
✓Autorisations obtenues(implicite)+8
✓Raccordement au réseau obtenu(implicite)+7

Commercial

✗Contrat d’offtake ferme+15
✓MOU / lettre d’intention d’offtake(implicite)+5
✗Prix ou tarif confirmé+5
✗Candidature à un programme public+5

Financement

✗Financement de projet ou dette obtenu+10
–Subvention (non renseignée)+0

Antécédents

✗Le développeur a mené à bien un projet H2+5
✗Le développeur a mené à bien un projet renouvelable+3
✗Le développeur a une expérience dans l’énergie+2