Port Arthur

En service✓ Source confirmée

Air Products (H2 for the Valero refinery)

Aperçu du projet

Pays
United States
Région
Texas
Capacité
Non publiée
Technologie
SMR + CCS
Investissement
—
Statut de la subvention
—

Non modélisé ici

This project is not electrolytic hydrogen, so the LCOH engine cannot model it: there is no electrolyser capex, no kWh/kg of electricity and no stack to replace. GaugeH2 refuses the conversion rather than returning a number of the wrong shape. Catalogue technology: smr_ccs.

Not determinableChapitre 8 · R46

RFNBO threshold by feedstock

This is a fossil route and the record does not state a capture rate. To fall below the RFNBO limit of 3.384 kg CO2e/kg H2 it would need at least 70.2 % capture. GaugeH2 does not know whether this project reaches it, and does not assume it.

Calendrier de développement

Annoncé—
FID—
Construction—
En service2013

Score de maturité

72/ 100
Avancé

Liste pondérée d’informations publiques. Ce n’est pas une prédiction de succès.

Développement

✓Décision finale d’investissement(implicite)+15
✓Contrat EPC signé(implicite)+10
✓Autorisations obtenues(implicite)+8
✓Raccordement au réseau obtenu(implicite)+7

Commercial

✓Contrat d’offtake ferme(implicite)+15
✓MOU / lettre d’intention d’offtake(implicite)+5
✓Prix ou tarif confirmé(implicite)+5
✗Candidature à un programme public+5

Financement

✓Financement de projet ou dette obtenu(implicite)+10
–Subvention (non renseignée)+0

Antécédents

✗Le développeur a mené à bien un projet H2+5
✗Le développeur a mené à bien un projet renouvelable+3
✓Le développeur a une expérience dans l’énergie+2