Linde - Fort Saskatchewan

Construção✓ Fonte confirmada

Linde (for Dow Path2Zero)

Visão geral do projeto

País
Canada
Região
Alberta
Capacidade
Não publicada
Tecnologia
SMR + CCS
Investimento · âmbito não declarado (EUR)
1900 M€

≈ 2000 M$, convertido com EUR_TO_USD = 1.08, fixado em 1 Jun 2026

Situação do subsídio
—

Não é modelado aqui

This project is not electrolytic hydrogen, so the LCOH engine cannot model it: there is no electrolyser capex, no kWh/kg of electricity and no stack to replace. GaugeH2 refuses the conversion rather than returning a number of the wrong shape. Catalogue technology: smr_ccs.

Not determinableCapítulo 8 · R46

RFNBO threshold by feedstock

This is a fossil route and the record does not state a capture rate. To fall below the RFNBO limit of 3.384 kg CO2e/kg H2 it would need at least 70.2 % capture. GaugeH2 does not know whether this project reaches it, and does not assume it.

Calendário de desenvolvimento

Anunciado—
FID—
Construção—
Em operação2028data prevista

Pontuação de maturidade

50/ 100
Em desenvolvimento

Lista de verificação ponderada de informação pública. Não é uma previsão de sucesso.

Desenvolvimento

✓Decisão final de investimento(implícito)+15
✓Contrato EPC assinado(implícito)+10
✓Licenças obtidas(implícito)+8
✓Ligação à rede assegurada(implícito)+7

Comercial

✗Contrato de offtake vinculante+15
✓MOU / carta de intenção de offtake(implícito)+5
✗Preço ou tarifa confirmados+5
✗Candidatura a um programa público+5

Financiamento

✗Financiamento do projeto ou dívida assegurados+10
–Subsídio (não registado)+0

Histórico

✓O promotor concluiu um projeto de H2+5
✓O promotor concluiu um projeto renovável+3
✓O promotor tem experiência em energia+2