Green hydrogen project tracker

Showing 20 of 133 projects— Full access in the pilot programme

Scores recomputed 4 days ago

Sign in to filter by capacity

Readiness filters are part of the pilot programme

NameCountryMWStatus
Iberdrola Puertollano Green HydrogenIberdrolaSpain20Operational
T-HYNET TarragonaRepsol / Enagás Renovable / MesserSpain150Delayed
Pamesa - eCombustiblePamesa Cerámica / eCombustible EnergySpain8Operational
Green Hysland Mallorca - Phase 1Enagas Renovable (leader) and Acciona Energia, with IDAE, Redexis and CemexSpain2.5Operational
Hydrogen plant - Environmental Business Park (PEMA)H2 Duero (Redexis / Somacyl)Spain2.5Operational
BP Castellon refinery, phase 1 (HyVal)Castellón Green Hydrogen S.L. (bp / Iberdrola)Spain25FID
Los Barrios coal plant, Cadiz, phase 1Moeve (Cepsa)Spain5FID
Mine-to-H2 Asturias Green Hydrogen HubGrupo HUNOSA, Duro Felguera, HyREN, ALSA, Universidad de Oviedo, GIGSpain2.5Pre-FID
ITHERAragon Hydrogen Foundation (FHa)SpainNot publishedOperational
RES2H2 Gran CanariaUniversity of Las Palmas de Gran Canaria (coordinator) with ITC, INTA, Inabensa and 14 other partnersSpain0.025Cancelled
CUTE and HyFLEET:CUTE, BarcelonaTransports de Barcelona (TMB) / CUTE-HyFLEET:CUTE consortium (coordinated by DaimlerChrysler)Spain0.3Cancelled
REMOTE - Spain, Canary IslandsTechnological Institute of the Canary Islands (ITC)SpainNot publishedOperational
Iberdrola - Puertollano II (extension from Ref10)Iberdrola Clientes + FertiberiaSpain200Pre-FID
Hysencia, Phase IDH2 ENERGY (SPV Angus Enterprise) — NO IgnisSpain35Pre-FID
La RoblaRobla Hub (JV of Naturgy and Enagás Renovable); Fertiberia as the main potential consumerSpain280Pre-FID
RENOVAGASEnagás (leader); Abengoa Hydrogen, Naturgy, FCC-Aqualia, Tecnalia, CNH2, ICP-CSICSpain0.015Cancelled
HRS TMB Zona Franca de BarcelonaIberdrola (plant/hydrogen) with TMB as main clientSpain2.5Operational
HRS CNH2 PuertollanoNational Hydrogen Center (CNH2)Spain0.06Operational
Iberdrola - Palos de la Frontera IIberdrola + FertiberiaSpain200Delayed
Repsol Cartagena, phase 1Repsol (75%) + Enagás Renewable (25%)Spain100FID

113 more projects available

Sign in for up to 50 projects, or request the pilot programme for full access.

Sign in