Green hydrogen projects in Spain

The green hydrogen projects GaugeH2 tracks in Spain: 133 projects, each checked against a public source, with their status, technology and capacity.

projects
133
projects
MW in the active pipeline
21,122
MW in the active pipeline
operational
15
operational
with FID or in construction
8
with FID or in construction
Projects by status
Announced
27
Pre-FID
68
FID
4
Construction
4
Operational
15
Delayed
3
Suspended
3
Cancelled
9

projects

Projects by electrolyser technology
20%
19%
60%
  • PEM (27)20%
  • Alkaline (25)19%
  • SOEC (1)0.8%
  • Other or not disclosed (80)60%

Largest projects in the active pipeline

ProjectMWStatus
First HyDeal hub, completion4,100Pre-FID
First HyDeal hub, phase 13,300Pre-FID
BP Castellon refinery, phase 2 (HyVal)1,975Pre-FID
Kolya-PNE Albacete1,000Announced
MetGreenPort800Announced
Hive H2 Albamed, phase 1800Pre-FID
Hive H2 Albamed, phase 2800Announced
ECO2FLY666Announced
ErasmoPower2X650Pre-FID
Catalina Project, Phase 1500Pre-FID

The active pipeline excludes cancelled and suspended projects. Capacities are electrolyser capacities as announced by each project; projects without a published capacity do not add MW. Figures come live from the catalogue.