Green hydrogen projects in Chile
The green hydrogen projects GaugeH2 tracks in Chile: 37 projects, each checked against a public source, with their status, technology and capacity.
- projects
- 37
- projects
- MW in the active pipeline
- 24,222
- MW in the active pipeline
- operational
- 9
- operational
- with FID or in construction
- 1
- with FID or in construction
Announced
9
Pre-FID
13
Construction
1
Operational
9
Suspended
3
Cancelled
2
projects
24%
73%
- PEM (9)24%
- Alkaline (1)3%
- Other or not disclosed (27)73%
Largest projects in the active pipeline
| Project | Developer | MW | Status |
|---|---|---|---|
| H2 Magallanes - Phase 2 | 3,700 | Pre-FID | |
| Gente Grande project - TEG Chile Magallanes | 3,638 | Pre-FID | |
| Los Amigos del Verano - phase 1 | 2,500 | Announced | |
| Cabeza de Mar | 2,250 | Pre-FID | |
| Hoasis (TCP Gecomp) | 2,100 | Announced | |
| Atacama Hydrogen Hub, phase 2 | 2,000 | Announced | |
| GAM - phase 1 | 1,800 | Pre-FID | |
| H2V Frontera Project | 1,700 | Pre-FID | |
| Llaquedona green hydrogen | 1,500 | Announced | |
| HNH | 1,300 | Pre-FID |
The active pipeline excludes cancelled and suspended projects. Capacities are electrolyser capacities as announced by each project; projects without a published capacity do not add MW. Figures come live from the catalogue.