Todos los proyectos

Puntuaciones recalculadas hace 4 días

TA’ZIZ blue ammonia

Construcción✓ Fuente contrastada

TA'ZIZ (ADNOC + ADQ) + Fertiglobe + Mitsui & Co. + GS Energy; EPC: Tecnimont (MAIRE)

Resumen del proyecto

País
United Arab Emirates
Región
Abu Dhabi
Capacidad
Sin publicar
Tecnología
SMR + CCS
Inversión
—
Estado de la subvención
—

No se modela aquí

This project is not electrolytic hydrogen, so the LCOH engine cannot model it: there is no electrolyser capex, no kWh/kg of electricity and no stack to replace. GaugeH2 refuses the conversion rather than returning a number of the wrong shape. Catalogue technology: smr_ccs.

Not determinableCapítulo 8 · R46

RFNBO threshold by feedstock

This is a fossil route and the record does not state a capture rate. To fall below the RFNBO limit of 3.384 kg CO2e/kg H2 it would need at least 70.2 % capture. GaugeH2 does not know whether this project reaches it, and does not assume it.

Calendario de desarrollo

Anunciado2021
FID2024
Construcción2024
Operativo2027fecha prevista

Puntuación de madurez

45/ 100
En desarrollo

Lista ponderada de información pública. No es una predicción de éxito.

Desarrollo

✓Decisión final de inversión(implícito)+15
✓Contrato EPC firmado(implícito)+10
✓Permisos obtenidos(implícito)+8
✓Conexión a la red asegurada(implícito)+7

Comercial

✗Contrato de offtake vinculante+15
✓MOU / carta de intención de offtake(implícito)+5
✗Precio o tarifa confirmados+5
✗Solicitud a un programa público+5

Financiación

✗Financiación del proyecto o deuda asegurada+10
–Subvención (sin registrar)+0

Trayectoria

✗El promotor ha completado un proyecto de H2+5
✗El promotor ha completado un proyecto renovable+3
✗El promotor tiene experiencia energética+2