Todos los proyectos

Puntuaciones recalculadas hace 4 días

Boryeong LNG Terminal

Pre-FID✓ Fuente contrastada

SK Innovation E&S (ex SK E&S) with Korea Midland Power (KOMIPO)

Resumen del proyecto

País
South Korea
Región
South Korea
Capacidad
Sin publicar
Tecnología
SMR + CCS
Inversión · alcance sin declarar (EUR)
1400 M€

≈ 1500 M$, convertido con EUR_TO_USD = 1.08, fijado el 1 Jun 2026

Estado de la subvención
—

No se modela aquí

This project is not electrolytic hydrogen, so the LCOH engine cannot model it: there is no electrolyser capex, no kWh/kg of electricity and no stack to replace. GaugeH2 refuses the conversion rather than returning a number of the wrong shape. Catalogue technology: smr_ccs.

Not determinableCapítulo 8 · R46

RFNBO threshold by feedstock

This is a fossil route and the record does not state a capture rate. To fall below the RFNBO limit of 3.384 kg CO2e/kg H2 it would need at least 70.2 % capture. GaugeH2 does not know whether this project reaches it, and does not assume it.

Calendario de desarrollo

Anunciado2021
FID—
Construcción—
Operativo2028fecha prevista

Puntuación de madurez

0/ 100
Fase inicial

Lista ponderada de información pública. No es una predicción de éxito.

Desarrollo

✗Decisión final de inversión+15
✗Contrato EPC firmado+10
✗Permisos obtenidos+8
✗Conexión a la red asegurada+7

Comercial

✗Contrato de offtake vinculante+15
✗MOU / carta de intención de offtake+5
✗Precio o tarifa confirmados+5
✗Solicitud a un programa público+5

Financiación

✗Financiación del proyecto o deuda asegurada+10
–Subvención (sin registrar)+0

Trayectoria

✗El promotor ha completado un proyecto de H2+5
✗El promotor ha completado un proyecto renovable+3
✗El promotor tiene experiencia energética+2