Todos los proyectos

Puntuaciones recalculadas hace 4 días

Quest

Operativo✓ Fuente contrastada

Shell Canada (AOSP: Shell 60%, Chevron 20%, Marathon 20%)

Resumen del proyecto

País
Canada
Región
Alberta
Capacidad
Sin publicar
Tecnología
SMR + CCS
Inversión · alcance sin declarar (EUR)
890 M€

≈ 961 M$, convertido con EUR_TO_USD = 1.08, fijado el 1 Jun 2026

Estado de la subvención
—

No se modela aquí

This project is not electrolytic hydrogen, so the LCOH engine cannot model it: there is no electrolyser capex, no kWh/kg of electricity and no stack to replace. GaugeH2 refuses the conversion rather than returning a number of the wrong shape. Catalogue technology: smr_ccs.

Not determinableCapítulo 8 · R46

RFNBO threshold by feedstock

This is a fossil route and the record does not state a capture rate. To fall below the RFNBO limit of 3.384 kg CO2e/kg H2 it would need at least 70.2 % capture. GaugeH2 does not know whether this project reaches it, and does not assume it.

Calendario de desarrollo

Anunciado—
FID—
Construcción—
Operativo2015

Puntuación de madurez

70/ 100
Avanzado

Lista ponderada de información pública. No es una predicción de éxito.

Desarrollo

✓Decisión final de inversión(implícito)+15
✓Contrato EPC firmado(implícito)+10
✓Permisos obtenidos(implícito)+8
✓Conexión a la red asegurada(implícito)+7

Comercial

✓Contrato de offtake vinculante(implícito)+15
✓MOU / carta de intención de offtake(implícito)+5
✓Precio o tarifa confirmados(implícito)+5
✗Solicitud a un programa público+5

Financiación

✓Financiación del proyecto o deuda asegurada(implícito)+10
–Subvención (sin registrar)+0

Trayectoria

✗El promotor ha completado un proyecto de H2+5
✗El promotor ha completado un proyecto renovable+3
✗El promotor tiene experiencia energética+2