Linde - Fort Saskatchewan

Bau✓ Quelle geprüft

Linde (for Dow Path2Zero)

Projektübersicht

Land
Canada
Region
Alberta
Leistung
Nicht veröffentlicht
Technologie
SMR + CCS
Investition · Umfang nicht angegeben (EUR)
1.900 M€

≈ 2.000 M$, umgerechnet mit EUR_TO_USD = 1.08, festgelegt am 1 Jun 2026

Förderstatus
—

Hier nicht modelliert

This project is not electrolytic hydrogen, so the LCOH engine cannot model it: there is no electrolyser capex, no kWh/kg of electricity and no stack to replace. GaugeH2 refuses the conversion rather than returning a number of the wrong shape. Catalogue technology: smr_ccs.

Not determinableKapitel 8 · R46

RFNBO threshold by feedstock

This is a fossil route and the record does not state a capture rate. To fall below the RFNBO limit of 3.384 kg CO2e/kg H2 it would need at least 70.2 % capture. GaugeH2 does not know whether this project reaches it, and does not assume it.

Entwicklungszeitplan

Angekündigt—
FID—
Bau—
In Betrieb2028geplanter Termin

Reifegrad

50/ 100
In Entwicklung

Gewichtete Checkliste öffentlicher Informationen. Keine Erfolgsprognose.

Entwicklung

✓Finale Investitionsentscheidung(abgeleitet)+15
✓EPC-Vertrag unterzeichnet(abgeleitet)+10
✓Genehmigungen erteilt(abgeleitet)+8
✓Netzanschluss gesichert(abgeleitet)+7

Kommerziell

✗Verbindlicher Abnahmevertrag+15
✓MOU / Absichtserklärung zur Abnahme(abgeleitet)+5
✗Bestätigter Preis / Tarif+5
✗Antrag bei einem staatlichen Programm+5

Finanzierung

✗Projektfinanzierung / Fremdkapital gesichert+10
–Förderung (nicht erfasst)+0

Erfahrung

✓Entwickler hat ein H2-Projekt abgeschlossen+5
✓Entwickler hat ein EE-Projekt abgeschlossen+3
✓Entwickler hat Energieerfahrung+2