Discounted Cash Flow model · Model v7.1.0 · Methodology v3.33
PEM · Southern Europe · 10 MW · 900 €/kW · BoP 30% · electricity 40 €/MWh · 4000 h/year. Solved with model v7.1.0, methodology v3.31. Edit the parameters and press Calculate LCOH to replace it with your own.
LCOH
Year 1 Production
Total CAPEX, gross of subsidy
Levelized Cost of Hydrogen
In constant money: €4.02/kg, the same project with nothing escalated and discounted at the real WACC of 4.90 %, in the money of the inputs. The figure above is nominal.
Model v7.1.0 — DCFThese figures are estimates for preliminary analysis only and do not constitute financial, investment or engineering advice.
Cost Breakdown (NPV-weighted)
Year 1 Production
760 t H₂
before stack degradation
Lifetime Production
14,534 t H₂
727 t/yr average over 20 years
Total CAPEX, gross of subsidy
€11.7M
incl. BoP; the subsidy is not deducted
€12.7M charged at year 0, with interest during construction (1.088725x)
Stack Replacements
1